Lexington, KY – (November 15, 2023) – PDI National Cranes, part of the PDI Group of Companies in King, Ontario, Canada, recently purchased a new Link-Belt Cranes 175|AT all-terrain crane. The crane was added to the company’s taxi fleet, which specializes in commercial, industrial, and general construction in the greater Toronto, Ontario, area.
According to Dallen Rands, Branch Manager for PDI National Cranes, the 175-ton (150-mt) all terrain crane is ideal for cell tower work because of ease of transport, one overflow truck, and quick setup time. PDI National Cranes Operator Peter Grummy estimates the crane can be set up in 30 to 40 minutes.
“In Ontario, we can run boom over the front, so no dolly is required. Then, we only need one truck and once we stack counterweight on the deck of the crane from the overflow, now we have a clean work platform for the fly – which we typically use the SmartFly for cell tower work. It’s a very clean setup without anything extra,” said Rands.
A common cell tower setup for PDI is usually just over 200 ft. (60.9 m) tall and made up of five different segments. The base triangular section of the cell tower is erected in place on the ground and can measure 24 ft. (7.3 m) wide, leg to leg. The tower segments taper as it rises, with the largest section 57 ft. (17.3 m) tall. The segments vary in weight from 6,000 to 8,000 lbs. (2 721 to 3 628 kg).
“Once I get the next section within two to three feet, I am able to fine meter on the crane, and on the camera as well as on the winch to precisely put it in place, just like the guys would want. Everything worked out perfectly,” said Crane Operator, Grummy.
PDI National Cranes is a taxi rental business so being able to quickly set up for varying cell towers or other applications is important.
“The way the crane walks with full counterweight and jib erected on a job, that exceeded my expectations. A recent project we did involved moving the crane with the counterweights and jib erected. It was a total of eight setups and it was totally amazing how fast the crane could move from set up to set up,” Grumny explained.
Resource: https://www.linkbelt.com/article/23_11_09_175at-perfect-fit-cell-tower-work-ontario
Tags
- 175|AT
- Aftermarket
- all-terrain
- autograde
- avetta
- Berco
- Best Managed Companies
- bushings
- Canada's Best Managed Companies
- Case Studies
- Caterpillar
- construction
- continuous improvement
- crane
- cranes
- crusherwearparts
- customer focused
- Deere
- dozer
- dozerblades
- efficient
- environment
- EQUIPMENTWATCH
- Esco
- ESS
- excavator
- Excavator Crawler Medium
- excavator telematics
- face sheild
- FINAL TIER 4 ENGINES
- fire
- fire safety
- FUEL CONSUMPTION
- fuel efficiency
- fuelconsumption
- fuelefficiency
- gnss
- gps
- grade
- grade control
- headandcoldstress
- healthandsafety
- healthandsafetyexcellence
- Heavy Equipment
- heavy lifting
- heavyequipment parts
- heavymachinery
- HEAVYMACHINERY TOOLS
- hybrid
- iCraneTrax
- idler
- imc2.0
- Intelligent Machines
- isn
- ITM
- jobsite
- jobsites
- johndeere
- Komatsu
- Komatsu Dozer
- Komatsu Excavator
- Lattice
- LBX
- lifting
- link belt excavator
- Link-Belt 245 X4 Spin Ace
- Link-Belt Cranes is Pulse 2.0
- linkbelt
- LINKBELTCRANES
- links
- loader
- loaderlips
- lockout and tagout
- loto
- machine
- machinecontrol
- maintenance
- my komatsu
- new excavator
- OEM
- pipe
- predictive maintenance
- preventionofslipsandfalls
- remote care
- rigging
- safestemployers
- safety
- safety glasses
- safety talk
- safetyandeyecontact
- safetyandharness
- safetyatheights
- safetycompliance
- safetyfirst
- safetyhandsignals
- safetyspotting
- safetytalks
- sitech
- slipsandfalls
- smart construction
- SMART QUARRY
- smartconstruction
- telematics
- tier4
- TOOLSAFETY
- topcon
- trackshoes
- trimble
- undercarraige
- undercarriage
- vises
- Volvo
- weir
- wheel loader
- WRENCH
- wsib
POST YOUR COMMENT